Q146475: Vertical Line Appears in a Project Name
Article: Q146475
Product(s): Microsoft Schedule+ for Windows
Version(s): WINDOWS:7.0
Operating System(s):
Keyword(s):
Last Modified: 17-DEC-1999
-------------------------------------------------------------------------------
The information in this article applies to:
- Microsoft Schedule+ for Windows, version 7.0
-------------------------------------------------------------------------------
SYMPTOMS
========
When you select a Project Name on the To Do tab, a line appears over the word
Project. The other projects that are not selected do not have this line through
the word Project.
WORKAROUND
==========
Change the size of the grid's columns; for example, move the column separator
between the check column and the description to the right away from the word
Project. Now when the Project line is selected, the line will not appear over
the word Project.
Additional query words: 7.0 to do gridline schedule plus
======================================================================
Keywords :
Technology : kbScheduleSearch kbSchedule700
Version : WINDOWS:7.0
=============================================================================
THE INFORMATION PROVIDED IN THE MICROSOFT KNOWLEDGE BASE IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND. MICROSOFT DISCLAIMS ALL WARRANTIES, EITHER EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. IN NO EVENT SHALL MICROSOFT CORPORATION OR ITS SUPPLIERS BE LIABLE FOR ANY DAMAGES WHATSOEVER INCLUDING DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL, LOSS OF BUSINESS PROFITS OR SPECIAL DAMAGES, EVEN IF MICROSOFT CORPORATION OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES SO THE FOREGOING LIMITATION MAY NOT APPLY.
Copyright Microsoft Corporation 1986-2002.