Q130176: Project versus File Labeling in SourceSafe
Article: Q130176
Product(s): Microsoft SourceSafe
Version(s): 2.20 3.0x 3.10 |2.20 3.0x 3.10 |
Operating System(s):
Keyword(s):
Last Modified: 07-DEC-2001
-------------------------------------------------------------------------------
The information in this article applies to:
-------------------------------------------------------------------------------
SUMMARY
=======
The ability to label both projects and individual files from within SourceSafe
gives the user a great deal of flexibility for source code control. The label
option can reduce redundancy within a database and in some cases can help the
user to better track projects.
MORE INFORMATION
================
Many organizations track version numbers and build numbers for programs. Some
users create a new project for each build or version while others label
individual files. Neither approach is wrong, but it can limit your ability to
fully tap the power of SourceSafe.
File labels are best used for tracking the progress of an individual file
independently from the version of the program that it is being used in. For
example, Microsoft Windows uses the CTRL3DV2.DLL file for 3-D enhancements to
various windows. The version of this file is important to many programs, and
therefore the version on this file is of high importance. This is how file-level
labels are best used. Tracking individual files (not necessarily all files
though) helps during development and testing.
Project-level labels are best used for tracking versions or builds of a program.
By placing a label on the parent project of certain programs, all of the child
projects and files inherently carry that label. Thus, one label on the parent is
the same as putting a label on each individual file under that parent project.
NOTE: Labels for the individual files within the project do not change if the
individual file label is changed. This saves a lot of time for the user and
reduces any errors from putting the wrong version label on a file or skipping a
file that should have been labeled.
By labeling the project, the user can reduce the number of projects that must be
used to track the life of a program. Normally if a development team is working
on version 5.0 of a program, there will be little use for version 1.0 of the
program. If a separate project is used for each version, then the version 1.0
project will remain unless it is deleted (along with the history), or just be
left over in the system (taking up valuable disk space).
If all of the parent projects have been labeled properly, then the development
team has the ability to GET a previous version of a program, ROLLBACK all
changes to the program, or SHARE-SEPARATE an old version of a program for
parallel development or bug fixes. No extra space is being taken up by this, the
number of excess projects is reduced, there is less risk of passing the 8191
object limitation (no more than 8191 projects or files under a single
subproject), and there is a more concise form of version/build level
organization.
Additional query words: ss3 vss vbwin 4.00 2.20 3.00 3.02 3.04 3.10
======================================================================
Keywords :
Version : 2.20 3.0x 3.10 |2.20 3.0x 3.10 |
=============================================================================
THE INFORMATION PROVIDED IN THE MICROSOFT KNOWLEDGE BASE IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND. MICROSOFT DISCLAIMS ALL WARRANTIES, EITHER EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. IN NO EVENT SHALL MICROSOFT CORPORATION OR ITS SUPPLIERS BE LIABLE FOR ANY DAMAGES WHATSOEVER INCLUDING DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL, LOSS OF BUSINESS PROFITS OR SPECIAL DAMAGES, EVEN IF MICROSOFT CORPORATION OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES SO THE FOREGOING LIMITATION MAY NOT APPLY.
Copyright Microsoft Corporation 1986-2002.